Skip to main content

SCOPE OF CIVIL ENGINEERING AFTER DIPLOMA IN 2020

After successfully completing Civil Engineering Diploma -:

Basically, I am also civil engineering Diploma holder, I have lot of experience in that field so, I am dicuss about jobs seeking students, how can do job after civil  diploma. First off all you decide after diploma you will get Govt sector job or Private jobs. But I experienced after diploma Govt sector provided various jobs like as a Junior engineering or  Junior Draftmen, Supervisor this type APPORIUNITY given by center Govt their SSC JE exam and states govt through entrance test bases. 
But in case Private sector , Diploma holder have survive very tuff. In private sector Companies seeking experienced person in construction line in about starting salary 8000 to 10000 rs, it's reality in private companies. So I can suggest in own experienced you have looked govt sector after diploma in civil engineering.

But in case your interest in private sector you can do Degree in civil engineering after Diploma engineering through Leateral entry process. That's Ground reality in Civil engineering line, I have experienced that situation after completed diploma in civil engineering. 


Job After Diploma


Various types of Diploma course after completing Diploma in civil engineering. 


After diploma in civil engineering there are various types of advance diploma courses are available in various colleges. Such as advance course are in structure Design,  Drafting and surveying diploma etc. These courses duration after Diploma is 2 years. After diploma thorough lateral entry they can do Betch Or B.E .These degree duration is 3 years. In Degree Transportation engineering, structure engineering Or irrigation engineering can do. Also in Bridge engineering.


There are various types of courses after Diploma in civil engineering-:

These courses can do easily after diploma in civil engineering

1) Advance diploma in Irrigation engineering
2) Advance diploma in Bridge engineering
3) Advance diploma in structural engineering
4) Advance diploma in surveying engineering
5) Advance diploma in Drafting engineering

These short term diploma can do after Degree or Diploma:-

1) AutoCAD civil 3D
2) Quantity Estimate
3) Stadd Pro
4) HEC-HMS
5) HES-RAS
6) Microsoft Project
7) StromCAD
8) 3D Max

After Diploma carrier option:-

After diploma carrier option are available in Government sector Or in private sector. There have lot of vacancy in government or private sector. Such as scope in Enterpranur in private sector.

1) As a structural Engineer
2) As a contractor
3) As a site Engineer
4) As a Surveyor

Government undertaking companies providing jobs such as-:

1) BHEL ( Bharat Heavy Electrical Limited)
2) ONGC (Oil Natural Gas Agency)
3) RIETS
4) CCI ( Cement Corporations of India)
5) NTPC (National Thermal Power Corporation)

Private undertaking Top companies-

1) L&T ( Larsen & Toubro)
2) Gammon
3)  Hindustan Limited
4) DLF
5) Hindustan construction company
6) Nagarjuna construction company
7) Punj Lloyd
8) SK singla construction company
9) MK singla construction company
10) GMR construction limited company
11) Jai Parkash Associates limited
12) GVK Power and infrastructure limite
13) Lanco infractech limited
14) IVRCL
15) KEC International Ltd
16) Essar Group
17) Jaypee Group

Comments

Popular posts from this blog

Running Account Bill from CPWD Department

In civil engg construction in INDIA , Running account bill of contractor are prepared by Junior Eng (JE) as well as with his department. This type of bill are prepared some of instruction follow by the department. Running Account Bill  basically prepared in work in ongoing process. This type of bill prepare in large type of construction amount. In that bill the total amount of construction divided by 50% of amount. For e.g in such case the total cost of project is 2 lack and in that case running Bill is half the total cost of construction. Running Account Bill is very important in construction field. Basically Running Account Bill is total cost of Project completed by contractor or Companies. In Running Account Bill 10% of total estimated cost given to the contractor or companies through the responsibly department. The 10% is the amount calculated by the total cost.   Making Running Bill of Building-: You must have tentative quantities of each activity that is r...

CAUSEWAY IN ROAD OR BRIDGE- HOW TO MAKE ESTIMATE OF CAUSEWAY CONSTRUCTION IN ROAD

DEFINITION  OF CAUSEWAY  IN ROAD- A cause way is a track of road, railway on the highest point or upper point of an embankment across a water logged area or a low or wet place. It is called as causeway in road.                                                           OR A road causeway is paved dip which allows the rain water or floods to pass over it. It may or may not have opening or vents for low water to flow in the road. It is called as causeway in road. Road causeway Causeway may have been constructed to natural wet land, such as canal or such as marshes land etc. Causeway used to easily moved traffic over the wet land or canals extra. The traditional meaning of a...

Atterberg's Limits (consistency limits) and Liquid state, Plastic state, Semi-solid state, Soild state and Importance of Atterberg's Limits

Consistency limits is the relative ease with which soil can be deformed. This term is generally used for fine grained soils.  Consistency limits  denotes "the degree of firmness of soil" Which may be termed as soft, firm, stiff.  Consistency   limits  of fine grained soils is related to a large extent on water content. A soil which is very soft at a higher percentage of water contemt become very hard with the decrease of water content.  A Swedish agriculture engineer Atterberg's   limits and consistency limits  describe in 1911.That a fine grained soil can exist in four states namely; Liquid, Plastic, semi-solid and soild state.  The water content at which the soil changes from one state to another state are known as Atterberg's limits and consistency limits.  Fine grained soil may be micmxed with to form a plastic paste which can be mould into any desired shape. The addition of water reduce the cohesion but the soil can s...