Skip to main content

ABOUT US


Hello Dosto, 

Mera nam Rajnish kumar hai, or yeh www.civiltechcon.xyz mera blog hai. Dosto, mai is blog ke jreeye apsse civil engineering ke related technical topics or latest construction ideas or after diploma and degree krke job kese search krne hai hmme. Eske related sarre information iss blog ke jreeye dunga mai. Dosto isske barre mai apko koi information lene ho to mai apke liye 24x7 ours available hu app mujse contact kr skte ho mere Email id choudharyrajnish764@gmail.com pr mail kr skte hai. Or bayiyo ager mera yeh blog successful rha to ane walle time mai apko mai video be provide krbaunga. 

Dosto, mai Govt job krta hu as a Junior Engineer at HPPWD mai. Maine Diploma civil engineering mai kiya hai. Dosto mai yehi se sarre information apse share krunga construction or technical topic related civil engineering. Or apko mai Jobs ke barre mai be jaankari deta rhunga time to time. 


About us:-
Name -: Rajnish kumar
State -:  Himachal Pradesh
City -:    Kangra
E-mail id :- choudharyrajnish764@gmail.com
URL-: www.civiltechcon.xyz

Comments

Popular posts from this blog

Running Account Bill from CPWD Department

In civil engg construction in INDIA , Running account bill of contractor are prepared by Junior Eng (JE) as well as with his department. This type of bill are prepared some of instruction follow by the department. Running Account Bill  basically prepared in work in ongoing process. This type of bill prepare in large type of construction amount. In that bill the total amount of construction divided by 50% of amount. For e.g in such case the total cost of project is 2 lack and in that case running Bill is half the total cost of construction. Running Account Bill is very important in construction field. Basically Running Account Bill is total cost of Project completed by contractor or Companies. In Running Account Bill 10% of total estimated cost given to the contractor or companies through the responsibly department. The 10% is the amount calculated by the total cost.   Making Running Bill of Building-: You must have tentative quantities of each activity that is r...

CAUSEWAY IN ROAD OR BRIDGE- HOW TO MAKE ESTIMATE OF CAUSEWAY CONSTRUCTION IN ROAD

DEFINITION  OF CAUSEWAY  IN ROAD- A cause way is a track of road, railway on the highest point or upper point of an embankment across a water logged area or a low or wet place. It is called as causeway in road.                                                           OR A road causeway is paved dip which allows the rain water or floods to pass over it. It may or may not have opening or vents for low water to flow in the road. It is called as causeway in road. Road causeway Causeway may have been constructed to natural wet land, such as canal or such as marshes land etc. Causeway used to easily moved traffic over the wet land or canals extra. The traditional meaning of a...

Atterberg's Limits (consistency limits) and Liquid state, Plastic state, Semi-solid state, Soild state and Importance of Atterberg's Limits

Consistency limits is the relative ease with which soil can be deformed. This term is generally used for fine grained soils.  Consistency limits  denotes "the degree of firmness of soil" Which may be termed as soft, firm, stiff.  Consistency   limits  of fine grained soils is related to a large extent on water content. A soil which is very soft at a higher percentage of water contemt become very hard with the decrease of water content.  A Swedish agriculture engineer Atterberg's   limits and consistency limits  describe in 1911.That a fine grained soil can exist in four states namely; Liquid, Plastic, semi-solid and soild state.  The water content at which the soil changes from one state to another state are known as Atterberg's limits and consistency limits.  Fine grained soil may be micmxed with to form a plastic paste which can be mould into any desired shape. The addition of water reduce the cohesion but the soil can s...