Skip to main content

Disclaimer


Disclaimer for Civil Engineering Hub

If you require any more information or have any questions about our site's disclaimer, please feel free to contact us by email at choudharyrajnish764@gmail.com

Disclaimers for Civil Engineering Hub

All the information on this website - www.civiltechcon.xyz - is published in good faith and for general information purpose only. Civil Engineering Hub does not make any warranties about the completeness, reliability and accuracy of this information. Any action you take upon the information you find on this website (Civil Engineering Hub), is strictly at your own risk. Civil Engineering Hub will not be liable for any losses and/or damages in connection with the use of our website. Our Disclaimer was generated with the help of the Disclaimer Generator and the Disclaimer Generator.
From our website, you can visit other websites by following hyperlinks to such external sites. While we strive to provide only quality links to useful and ethical websites, we have no control over the content and nature of these sites. These links to other websites do not imply a recommendation for all the content found on these sites. Site owners and content may change without notice and may occur before we have the opportunity to remove a link which may have gone 'bad'.
Please be also aware that when you leave our website, other sites may have different privacy policies and terms which are beyond our control. Please be sure to check the Privacy Policies of these sites as well as their "Terms of Service" before engaging in any business or uploading any information.

Consent

By using our website, you hereby consent to our disclaimer and agree to its terms.

Update

Should we update, amend or make any changes to this document, those changes will be prominently posted here.


Comments

Popular posts from this blog

Running Account Bill from CPWD Department

In civil engg construction in INDIA , Running account bill of contractor are prepared by Junior Eng (JE) as well as with his department. This type of bill are prepared some of instruction follow by the department. Running Account Bill  basically prepared in work in ongoing process. This type of bill prepare in large type of construction amount. In that bill the total amount of construction divided by 50% of amount. For e.g in such case the total cost of project is 2 lack and in that case running Bill is half the total cost of construction. Running Account Bill is very important in construction field. Basically Running Account Bill is total cost of Project completed by contractor or Companies. In Running Account Bill 10% of total estimated cost given to the contractor or companies through the responsibly department. The 10% is the amount calculated by the total cost.   Making Running Bill of Building-: You must have tentative quantities of each activity that is r...

CAUSEWAY IN ROAD OR BRIDGE- HOW TO MAKE ESTIMATE OF CAUSEWAY CONSTRUCTION IN ROAD

DEFINITION  OF CAUSEWAY  IN ROAD- A cause way is a track of road, railway on the highest point or upper point of an embankment across a water logged area or a low or wet place. It is called as causeway in road.                                                           OR A road causeway is paved dip which allows the rain water or floods to pass over it. It may or may not have opening or vents for low water to flow in the road. It is called as causeway in road. Road causeway Causeway may have been constructed to natural wet land, such as canal or such as marshes land etc. Causeway used to easily moved traffic over the wet land or canals extra. The traditional meaning of a...

Atterberg's Limits (consistency limits) and Liquid state, Plastic state, Semi-solid state, Soild state and Importance of Atterberg's Limits

Consistency limits is the relative ease with which soil can be deformed. This term is generally used for fine grained soils.  Consistency limits  denotes "the degree of firmness of soil" Which may be termed as soft, firm, stiff.  Consistency   limits  of fine grained soils is related to a large extent on water content. A soil which is very soft at a higher percentage of water contemt become very hard with the decrease of water content.  A Swedish agriculture engineer Atterberg's   limits and consistency limits  describe in 1911.That a fine grained soil can exist in four states namely; Liquid, Plastic, semi-solid and soild state.  The water content at which the soil changes from one state to another state are known as Atterberg's limits and consistency limits.  Fine grained soil may be micmxed with to form a plastic paste which can be mould into any desired shape. The addition of water reduce the cohesion but the soil can s...